凉山tangibleDrum mixerWhen loading, the mixture to be stirred is installed in the hopper, the feeding system is started, the wire rope pulls the hopper to climb up, when climbing to a certain height, the hopper enters the loading rack, the hopper door automatically opens, and the material is unloaded into the mixing cylinder through the funnel。JS750 mixer mixing system is composed of motor, pulley, reducer, gear, mixing device, mixing cylinder and so on。The main motor is connected to the two-stage gear reducer through the belt, and finally through the two pairs of open gears respectively drive the two horizontal mixing shaft to rotate towards the same speed。The electrical control system needs to control the main drive motor of the JS750 mixer, the motor of the water supply system, the motor of feeding, unloading, etc。All electrical control elements are located in the distribution box。The electrical components in the distribution box are installed on an iron plate, which is safe and reliable, easy to operate and maintain。The discharge system is at the bottom of the mixer, and the discharge is carried out by a manual push rod。According to customer requirements, we can produce mixers in the form of electric push rod discharge。The connection between the discharge door and the mixing cylinder shall be sealed with a sealing plate.Drum mixerproducerThe position of the seal plate can be adjusted to ensure the purpose of sealing。
Concrete mixing station is the necessary machinery for mixing concrete in construction machinery,Drum mixerproducerWith the expansion of China's real estate construction industry, highways, DAMS, hydropower stations and other construction and the promotion of commodity cement,The output of cement products is increased,Concrete mixing plant sales increase,As a result, there have also been different output, different types of mixing stations, widely recognized by the maid customers,And exported to Russia, Europe, India and other countries and regions。In recent years, the mixing station plays an important role in many industries,So that the JS series of mixing station gradually become the leading product of mixing stick cement,JS350 among them,JS500, JS750, JSI000 is a small and medium-sized mixing plant,JS1500, JS2000,J52500, JS3000 is a large mixing equipment,Its processing technology is more complex than the ordinary mixing station,Be a little more demanding,It can also be combined with the batching unit into a simple mixing station。With the increase of mixing plant manufacturers, mixing plant market competition has entered the white heat period, although most enterprises to produce small and medium equipment, but under the pressure of increased competition, mixing plant enterprises are moving toward personalized service, technological innovation, improve the ability of the mixer host,tangibleDrum mixerProduct diversification and other directions of development。
Concrete mixing station is widely used in infrastructure construction, many users of the understanding of concrete mixing station is only limited to how to use, for the quality of concrete mixing station is good or bad, and not very understanding, let alone to check the quality of the station bought。The main components of the concrete mixing station are also a few, so as long as these major components do not have quality problems, then the concrete mixing station does not have too much quality problems。1.If the mixer is a self-falling mixing drum, the radial runout of the discharge ring does not exceed 1% of the diameter of the feed port, but also check the quality of the steel bar of the vibrating screen mesh on the mixer and the reasonable size of the screen and screen hole and check the installation accuracy of the screen;2.The operation of the transmission system should be flexible, without abnormal sound;3.tangibleDrum mixerproducerBelt conveyor, bucket elevator and cantilever shovel transmission should be smooth, the operation should be flexible, the brake can be high, no abnormal noise, no card chain;4.The inspection of the measurement system is also very important, to check the sensitivity and accuracy of the measurement system;5.Reduce the lifting temperature of the machine should also pay attention to reach the temperature of the qualified book;6.Metering hopper in and out of the material should be smooth, no accumulation, overflow and other phenomena;7.tangibleDrum mixerproducerSafety valve can not appear leakage phenomenon;8.The quality of cement tank is qualified;9.The matching line installation should be reasonable and the installation of equipment should be correct。
No matter what machine needs to be maintained during use, so as to maximize the service life of the machine。Cement tank is an important storage equipment in concrete mixing station。Whether the cement tank is properly maintained will affect the use of the entire mixing plant。The maintenance of cement tanks is recommended from the following steps。Cement tank Daily maintenance Daily maintenance can be said to be a maintenance matter that must be done every day, and maintenance operations must be done before and after the use of cement tanks。The main point of this maintenance is inspection。Before and after operation, it is necessary to check whether the cement tank has signs of ash spraying, whether the material level display is accurate, whether the leg of the cement bin is deformed, and whether the operation of the screw conveyor is normal。Two, cement tank lubrication maintenance This maintenance is mainly for the cement tank lubrication system maintenance。tangibleDrum mixerproducerMaintenance should check the external connector, and in accordance with the requirements of the targeted parts of the need for lubrication。This maintenance is recommended every 3-5 days。This layer of maintenance mainly checks and adjusts the maintenance of various devices, control, transmission, steering, braking, transmission and other aspects of the cement tank, adjust if necessary, and eliminate the fault found。4. Preventive maintenance of cement tank The maintenance is based on prevention。Detailed inspection of each item in each position of the cement tank is generally done once a month。From the local to the whole one by one, check the potential trouble and eliminate。tangibleDrum mixerCheck tightness, clearance, wear, etc。
The main characteristics of concrete mixing station are as follows: 1.tangibleDrum mixerproducerThe combination structure, modular unit, installation, relocation is very convenient。2.Mixing machine and aggregate lifting adopts JS1000 type double horizontal shaft forced concrete mixer, which has good mixing quality and high efficiency。3.PLD1600 concrete batching machine is used for aggregate batching, which has accurate measurement and high production efficiency。4.Drum mixerproducerThe powder is measured by electronic balance with high precision。5.The water is measured by electronic balance, and the batching precision is high。